Rs. 350000.00
( Price inclusive of all taxes )
Availability: In stock
Self weight | Self weight |
30%lighter | More heavy |
Primary member is tapered section | Primary member are hot rolled “I” section |
Secondary member are light weight rolled framed “Z” and “C” section |
Secondary member are “I” or “C” section which are heavy in weight |
Delivery – average 6 to 8 weeks | Delivery – average 20 to 26 weeks |
Foundation – simple design, easy to construct & light wt. | Foundation – expensive, heavy foundation required. |
Erection cost & time – accurately known | Erection cost & time – 20% more thanPEB |
Erection process is easy, fast step by step | Erection process is slow & extensive field labor is required. |
Erection process is slow & extensive field labor is required. | Seismic resistance – rigid heavy weight structures do not perform well in seismic zones |
Overall price -30% lower | Overall price- higher price per square meter. |
Architecture – achieved at low cost | Architecture – achieved at higher cost |