JavaScript is disable on your browser.For full functionality of this page it is necessary to enable JavaScript. Here are the instructions how to enable JavaScript in your web browser
Pre Engineered Buildings By : Semco Infracon , Pune
Quantity in stock : 120

Rs. 350000.00

( Price inclusive of all taxes )

Availability: In stock

Ask for Best Price Beta

pre engineering building

Description

STEPS OF DESIGN :-
  • STEPS OF DESIGN :-
  • Wind load calculation
  • Purline Design
  • Girt Design
  • Design of main frame
  • Base Plate
  • Anchor Bolt design for moment condition
  • Anchor bolt design for shear condition
  • Gable column design
  • Design of connection plate
  • Cranes Design
DESIGN ISSUES :-
  • Structural Planning.
  • Frame Configurations
  • Type Of Loads & 
  •   Assessment
  • End Conditions
  • Cranes
  • Mezanines
  • Load Combinations
Self weight Self weight
30%lighter More heavy
Primary member is tapered section Primary member are hot rolled “I” section
Secondary member are light weight rolled framed “Z” and 
“C” section
Secondary member are “I” or “C” section which are heavy in weight
Delivery – average 6 to 8 weeks Delivery – average 20 to 26 weeks
Foundation – simple design, easy to construct & light wt. Foundation – expensive, heavy foundation required.
Erection cost & time – accurately known Erection cost & time – 20% more thanPEB
Erection process is easy, fast step by step Erection process is slow & extensive field labor is required.
Erection process is slow & extensive field labor is required. Seismic resistance – rigid heavy weight structures do not perform well in seismic zones
Overall price -30% lower Overall price- higher price per square meter.
Architecture – achieved at low cost Architecture – achieved at higher cost

Ratings and Reviews